Overfill Prevention

Periodic inspections must be completed any time before or during the month the testing is required. [23 CCR §2620(e)].  Conducting an inspection late does not change the due date for the next periodic inspection (i.e., if an inspection due by October 13, 2018 is not done until December of 2018, the future inspections are due any time during October of 2021 and every 36 months thereafter).

Overfill prevention equipment inspections must be performed by a UST Service Technician meeting the requirements of 23 CCR Section 2715(f).

 